Engineered lumber in Cohoes does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

A. Phillips Hardware
518-765-2377
18 South Main St
Voorheesville, NY
The Home Depot
(518)348-0158
4 Halfmoon Crossing Blvd
Halfmoon, NY
Lowe's
(518) 436-6020
271 Route 9 West
Glenmont, NY
Clifton Park - D
(518) 383-6910
15 Park Ave
Clifton Park, NY
Colonie Ctr Mall
(518) 454-3000
1425 Central Ave
Albany, NY
Pfeil Hardware
518-687-0014
63 Third St
Troy, NY
Phillips Hardware
518-459-2300
42 Saratoga Ave
Waterford, NY
The Home Depot
(518)782-9867
579 Troy-Schenectady Rd
Latham, NY
Rotterdame Sq Mall
(518) 386-5200
93 W Campbell Rd
Rotterdam, NY
Kmart 3129 / Cross Merch
(518) 449-1195
164 Columbia Tpke
Rensselaer, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fighting Fastener Corrosion Cohoes NY
Deck building used to be simpler. At the lumberyard, you’d load up on CCA-treated 2-by stock for the floor system, 6x6s for the posts, and whatever the budget allowed for the decking — anything from 1x6 pressure treated to more-expensive 1x4 Doug fir.
- Green Building Products Cohoes NY
- Engineered Lumber Cohoes NY
- Frugal House Framing Cohoes NY
- Forklift Operation Cohoes NY
- Green Products - Product Reviews Cohoes NY
- Ergonomic Principles of Forklift Design Cohoes NY
- Home Exterior Ideas Cohoes NY
- Festool Circ Saw and Guide Rail System Cohoes NY
- Fasteners and Connectors Cohoes NY