Framer's Guide to Engineered Lumber Camillus NY

Engineered lumber in Camillus does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Village Ace Hardware
(315) 834-2275
2701 Erie Dr
Weedsport, NY
Lowe's
(315) 652-1200
3856 State Route 31
Liverpool, NY
Fastenal- Liverpool
315-451-3807
7184 Morgan Rd Liverpool, NY, 13090
Liverpool, NY
Nightingale True Value Hdwe
(315) 673-2001
4068 South St
Marcellus, NY
The Home Depot
(315)484-7240
3756 Milton Avenue
Camillus, NY
Suburban Hardware Inc
(315) 652-7850
7990 Oswego Rd
Liverpool, NY
Lowe's
(315) 350-2220
5377 West Genesee Street
Camillus, NY
Fastenal- Auburn
315-258-8054
360 Grant Ave Auburn, NY, 13021
Auburn, NY
Tully Do it Best Bldg Supply
315-696-8984
24 Onondaga Street
Tully, NY
The Home Depot
(315)252-4540
1634 Clark Street Road
Auburn, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade