Framer's Guide to Engineered Lumber Brentwood NY

Engineered lumber in Brentwood does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
Costello's Ace Hardware
(516) 798-5757
5135 Merrick Rd, Gino's
Massapequa Park, NY
Karps Hardware
631-261-1235
2 Larkfield Rd
East Northport, NY
The Home Depot
(516)364-4677
111 Jericho Turnpike
Syosset, NY
Sunrise Mall
(516) 797-2400
800 Sunrise Mall
Massapequa, NY
EXOTIC WOODS USA
(631) 651-8651
698 Fort Salonga Rd
Northport, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
ABC Supply Co.,Inc/Bohemia
631-285-7710
2950 Veterans Memorial Hwy Bohemia, NY, 11716
Bohemia, NY
The Home Depot
(631)732-9200
401 Independence Plaza
Selden, NY
Patchogue - Sears Hardware Stores
(631) 447-7304
367 Sunrise Hwy 389
Patchogue, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Ergonomic Principles of Forklift Design Brentwood NY
An aching back, strained muscles, and stiff joints are just a few symptoms of fatigue a forklift operator might accumulate in a day of sitting or standing, wrestling a steering wheel, operating hydraulic controls, and climbing on and off the forklift. That's why forklift designers are taking ergonomics principles more seriously than ever.
- Fasteners and Connectors Brentwood NY
- Forklift Operation Brentwood NY
- Green Products - Product Reviews Brentwood NY
- Festool Circ Saw and Guide Rail System Brentwood NY
- Green Building Products Brentwood NY
- Frugal House Framing Brentwood NY
- Fighting Fastener Corrosion Brentwood NY
- Engineered Lumber Brentwood NY
- Home Exterior Ideas Brentwood NY