Framer's Guide to Engineered Lumber Bethpage NY

Engineered lumber in Bethpage does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
CLEARVIEW PAINT & DECOR
(718) 747-5000
20-11 Francis Lewis Blvd
Whitestone, NY
Great Neck Hardware
516-439-4399
135 Cuttermill Rd
Great Neck, NY
Queens -Sears Hardware Stores
(718) 776-8156
22005 Hillside Ave
Queens Vlg, NY
South Shore Mall
(631) 969-2000
1701 Sunrise Hwy
Bay Shore, NY
EXOTIC WOODS USA
(631) 651-8651
698 Fort Salonga Rd
Northport, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
Cross Bay Hardware
(718) 848-5699
158-18 Cross Bay Blvd
Howard Beach, NY
Tonys Hardware & Tool Rental
12414 Liberty Ave
S Richmond Hill, NY
N Babylon/Deer Pk - Sears Hardware Stores
(631) 667-3958
20 Deer Shore Sq
North Babylon, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles