Framer's Guide to Engineered Lumber Beacon NY

Engineered lumber in Beacon does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

ABC Supply Co.,Inc/Newburgh
845-561-5565
150 S. Water Street Newburgh, NY, 12550
Newburgh, NY
LOWE'S OF NEWBURGH, NY
845 567-2860
1239 ROUTE 300 NEWBURGH, NY, 12550
Newburgh, NY
Scotts Corners Hardware
845-457-5005
1037 State Route 17K
Montgomery, NY
The Home Depot
(845)298-9200
1570 Route 9
Wappingers Falls, NY
Poughkeepsie - D
(845) 471-9300
635 Dutchess Turnpike
Poughkeepsie, NY
Williams Lumber Inc
(845) 221-2751
908 Route 82
Hopewell Junction, NY
J & R TOOL CO
(845) 279-6169
3651 DANBURY RD, RTE 6 BREWSTER, NY, 10509
Brewster, NY
LOWE'S OF POUGHKEEPSIE, N. Y.
845 298-4720
GALLERIA MALL 790 SOUTH RD POUGHKEEPSIE, NY, 12601
Poughkeepsie, NY
The Home Depot
(914)528-1539
3131 E Main St
Mohegan Lake, NY
Kmart 3372 / Cross Merch
(845) 297-1246
1895 South Road
Poughkeepsie, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fasteners and Connectors Beacon NY
Some of the fasteners and connectors on the market are engineered for better performance in a variety of materials, including popular wood alternatives like PVC and composite trims, while other new introductions help solve common fastener and connector issues.
- Frugal House Framing Beacon NY
- Festool Circ Saw and Guide Rail System Beacon NY
- Green Products - Product Reviews Beacon NY
- Engineered Lumber Beacon NY
- Home Exterior Ideas Beacon NY
- Ergonomic Principles of Forklift Design Beacon NY
- Fighting Fastener Corrosion Beacon NY
- Green Building Products Beacon NY
- Forklift Operation Beacon NY