Framer's Guide to Engineered Lumber Baldwin NY

Engineered lumber in Baldwin does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
Pintchik
(718) 783-3333
478 Bergen St
Brooklyn, NY
Cityline Hardware
718-277-1079
1081 Liberty Ave
Brooklyn, NY
The Home Depot
(718)230-0833
585 Dekalb Ave
Brooklyn, NY
Queens -Sears Hardware Stores
(718) 776-8156
22005 Hillside Ave
Queens Vlg, NY
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
Corner Hardware & Paint
(718) 377-8516
2266 Nostrand Ave
Brooklyn, NY
Metropolitan Distributors Corp
718-657-0100
108-20 Merrick Blvd
Jamaica, NY
Rego Park - A
(718) 830-5900
9605 Queens Blvd
Rego Park, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade