Framer's Guide to Engineered Lumber Albany NY

Engineered lumber in Albany does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Olsen's Hardware & Garden Center
(518) 475-9483
1900 New Scotland Rd
Slingerlands, NY
Burnt Hills Hardware & Supply Co
(518) 399-8141
217 Kingsley Rd
Burnt Hills, NY
A. Phillips Hardware
518-439-9943
235 Delaware Ave
Delmar, NY
The Home Depot
(518)438-1586
979 Central Avenue
Albany, NY
Kmart 3129 / Cross Merch
(518) 449-1195
164 Columbia Tpke
Rensselaer, NY
Nassau Country Value
(518) 766-3717
3517 US Rte 20
Nassau, NY
ABC Supply Co.,Inc/Albany
518-489-5581
15 Kairnes Street Albany, NY, 12205
Albany, NY
A. Phillips Hardware
518-861-5364
Osborne Corners
Altamont, NY
Phillips Hardware
518-459-2300
42 Saratoga Ave
Waterford, NY
Rotterdame Sq Mall
(518) 386-5200
93 W Campbell Rd
Rotterdam, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fighting Fastener Corrosion Albany NY
Deck building used to be simpler. At the lumberyard, you’d load up on CCA-treated 2-by stock for the floor system, 6x6s for the posts, and whatever the budget allowed for the decking — anything from 1x6 pressure treated to more-expensive 1x4 Doug fir.
- Home Exterior Ideas Albany NY
- Green Building Products Albany NY
- Frugal House Framing Albany NY
- Engineered Lumber Albany NY
- Green Products - Product Reviews Albany NY
- Ergonomic Principles of Forklift Design Albany NY
- Forklift Operation Albany NY
- Festool Circ Saw and Guide Rail System Albany NY
- Fasteners and Connectors Albany NY