Foolproof Layout Method Plans Shirley NY

When framing walls in Shirley, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right.

Local Companies

Davis Homes Inc
(631) 281-8010
1390 William Floyd Pkwy
Shirley, NY
Baybrook Homes Inc
(631) 281-1600
863 Montauk Hwy
Shirley, NY
H & A Contracting
(631) 399-4466
77 Ostend Cir
Shirley, NY
C N Trinaty Constraction
(631) 772-8466
67 Heston Rd
Shirley, NY
Euro-Tech Siding & Contracting Inc
(631) 345-0500
468 Avondale Dr
Shirley, NY
Landscape Design By Lee
(631) 589-0076
Sayville Boulevard
Sayville, NY
Structural Technology Inc
(631) 281-4800
1029 William Floyd Pkwy
Shirley, NY
Aurora Home Improvements
(631) 924-2454
137 Carlton Dr E
Shirley, NY
Elegant Touch Remodeling
(631) 281-7033

Shirley, NY
Durabilt Exteriors
(631) 395-2739
456 Carnation Dr
Shirley, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: November 1, 2003

By Steve Veroneau

Picture these scenarios: You've agonized to measure, double-check, and line up a complicated roofline, but after nailing up the rafters, you notice that the fascia lines are out of whack. Or, you've cut out all of your tair stringers, only to realize they don't fit and now you're racing rush-hour traffic to the lumberyard. Here are a few layout methods with built-in double-checks that can help solve problems before they start.

Layout Direction. When framing walls, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right. The direction doesn't matter as long as it's the same throughout the building, including the second and third floors. Consistent layout direction ensures that studs, rafters, and joists align throughout construction. This makes life easier for installing duct work, pipes, or conduit later, leaving any bay useable as a chase throughout the structure.

Repeating Wall Patterns. Plate and detail any lined-up, same-dimension walls at the same time, so you only pull your tape once for multiple walls. For example, architects often load long hallways with closets that are usually the same size; cutting them and laying them out in one shot is easier, more accurate, and faster than laying them out as you go. It's also common to see repeating wall patter...

Click here to read full article from Tools of the Trade

Related Articles
- Framing Gable and Shed Dormers Shirley NY
Whenever adding any type of dormer, it's essential to determine the roof load and design the load path transfer to the existing floor joists or roof rafters. Then you can ensure adequate bearing points, or add framing and install beams to carry the loads through the walls down to the foundation. It wouldn't be a bad idea to consult a structural engineer for guidance, especially on larger dormers.
- Hidden-Fastener Tool Shirley NY
- Eliminating Swirls in Precast Panels Shirley NY
- Framer's Guide to Engineered Lumber Shirley NY
- How Masonry Buildings Resist Earthquakes Shirley NY
- Framing Square Shirley NY