Foolproof Layout Method Plans Rome NY

When framing walls in Rome, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right.

Local Companies

Rome Power & Hardware Incorporated
(315) 336-7378
1217 Erie Blvd W
Rome, NY
Newman Landscaping
(315) 853-3798
Oneida County
Utica, NY
Belmonte Landscaping & Maintence
(315) 724-7303
1709 Genesee St
Utica, NY
Ginos Lawn Service
(315) 525-5506
309 W Locust St
Rome, NY
Dave's Lawn Care & Yard Maintenance
(315) 797-2859
300 Tumbleweed Dr
Utica, NY
Hilltop Nursery & Landscaping
(315) 337-6073
7379 Canterbury Hill Rd
Rome, NY
Jazzy's Landscaping & Gen Cont
(315) 734-0449
1013 Sunset Ave
Utica, NY
Millers Landscaping LLC
(315) 339-4358
Utica, NY
Four Seasons Landscape Management
(315) 266-2068
1142 Saint Vincent St
Utica, NY
Sykes Services
(315) 266-0051
Utica, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: November 1, 2003

By Steve Veroneau

Picture these scenarios: You've agonized to measure, double-check, and line up a complicated roofline, but after nailing up the rafters, you notice that the fascia lines are out of whack. Or, you've cut out all of your tair stringers, only to realize they don't fit and now you're racing rush-hour traffic to the lumberyard. Here are a few layout methods with built-in double-checks that can help solve problems before they start.

Layout Direction. When framing walls, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right. The direction doesn't matter as long as it's the same throughout the building, including the second and third floors. Consistent layout direction ensures that studs, rafters, and joists align throughout construction. This makes life easier for installing duct work, pipes, or conduit later, leaving any bay useable as a chase throughout the structure.

Repeating Wall Patterns. Plate and detail any lined-up, same-dimension walls at the same time, so you only pull your tape once for multiple walls. For example, architects often load long hallways with closets that are usually the same size; cutting them and laying them out in one shot is easier, more accurate, and faster than laying them out as you go. It's also common to see repeating wall patter...

Click here to read full article from Tools of the Trade

Related Articles
- Framing Gable and Shed Dormers Rome NY
Whenever adding any type of dormer, it's essential to determine the roof load and design the load path transfer to the existing floor joists or roof rafters. Then you can ensure adequate bearing points, or add framing and install beams to carry the loads through the walls down to the foundation. It wouldn't be a bad idea to consult a structural engineer for guidance, especially on larger dormers.
- Framing Square Rome NY
- How Masonry Buildings Resist Earthquakes Rome NY
- Eliminating Swirls in Precast Panels Rome NY
- Framer's Guide to Engineered Lumber Rome NY
- Hidden-Fastener Tool Rome NY