Foolproof Layout Method Plans Ossining NY

When framing walls in Ossining, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right.

Local Companies

Land Masters
(203) 210-7201
1117 East Putnam Avenue
Riverside, CT
Ny Landscape Lighting
914-523-2578
245 Bronx River Road 3B
Yonkers, NY
Sod Father Landscaping
(914) 421-0089
101 Griffin Pl
White Plains, NY
Michael Disavino Landscaping
(914) 328-0508
119 Park Ave
White Plains, NY
Cipriano Landscaping
(914) 686-5607
38 Buckout Rd
White Plains, NY
A Palmieri Landscaping Company, Inc
914-699-2257
6 Penn Place
Pelham Manor, NY
North Shore Irrigation & Landscape
201-573-9257
27 Saddle River Road
Woodcliff Lake, NJ
Visione Landscaping Inc.
914-769-7586
343 Sherman Avenue
Hawthorne, NY
M & A Landscaping Incorporated
(914) 949-3015
91 Lincoln Ave E
White Plains, NY
A Plus Landscaping & Design
(914) 684-0897
227 Battle Ave
White Plains, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: November 1, 2003

By Steve Veroneau

Picture these scenarios: You've agonized to measure, double-check, and line up a complicated roofline, but after nailing up the rafters, you notice that the fascia lines are out of whack. Or, you've cut out all of your tair stringers, only to realize they don't fit and now you're racing rush-hour traffic to the lumberyard. Here are a few layout methods with built-in double-checks that can help solve problems before they start.

Layout Direction. When framing walls, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right. The direction doesn't matter as long as it's the same throughout the building, including the second and third floors. Consistent layout direction ensures that studs, rafters, and joists align throughout construction. This makes life easier for installing duct work, pipes, or conduit later, leaving any bay useable as a chase throughout the structure.

Repeating Wall Patterns. Plate and detail any lined-up, same-dimension walls at the same time, so you only pull your tape once for multiple walls. For example, architects often load long hallways with closets that are usually the same size; cutting them and laying them out in one shot is easier, more accurate, and faster than laying them out as you go. It's also common to see repeating wall patter...

Click here to read full article from Tools of the Trade

Related Articles
- Hidden-Fastener Tool Ossining NY
Premium synthetic decks are the heart of my deck-building business, and I use hidden fasteners on all of my projects. In fact, I’m so familiar with hidden clips and screws that I almost wince just typing about them.
- Eliminating Swirls in Precast Panels Ossining NY
- Framer's Guide to Engineered Lumber Ossining NY
- How Masonry Buildings Resist Earthquakes Ossining NY
- Framing Gable and Shed Dormers Ossining NY
- Framing Square Ossining NY