Foolproof Layout Method Plans Mastic NY

When framing walls in Mastic, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right.

Local Companies

Ldl Contracting
(631) 281-0507
243 Whittier Dr
Mastic, NY
New Perspective Bldg Inc
(631) 878-4678
1280 Montauk Hwy
Mastic, NY
Synthesis Inc
(212) 619-3232
26 Federal Plz
New York, NY
Pazmino Industries Corp
(518) 233-1323
62 Canvass St
Cohoes, NY
Twin Tier Paving Co Inc
(607) 723-4642
20 Belden St
Binghamton, NY
Landscape Design By Lee
(631) 589-0076
Sayville Boulevard
Sayville, NY
J Dertinger Contracting Corp
(631) 399-9401
65 Washington Dr
Mastic, NY
Windmill Development Llc
(631) 281-3700
28C Commack Rd
Mastic, NY
Trw Construction Inc
(607) 562-3010
138 Davenport Rd
Big Flats, NY
Pride Contracting Inc
(718) 442-8808
72 Kermit Ave
Staten Island, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: November 1, 2003

By Steve Veroneau

Picture these scenarios: You've agonized to measure, double-check, and line up a complicated roofline, but after nailing up the rafters, you notice that the fascia lines are out of whack. Or, you've cut out all of your tair stringers, only to realize they don't fit and now you're racing rush-hour traffic to the lumberyard. Here are a few layout methods with built-in double-checks that can help solve problems before they start.

Layout Direction. When framing walls, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right. The direction doesn't matter as long as it's the same throughout the building, including the second and third floors. Consistent layout direction ensures that studs, rafters, and joists align throughout construction. This makes life easier for installing duct work, pipes, or conduit later, leaving any bay useable as a chase throughout the structure.

Repeating Wall Patterns. Plate and detail any lined-up, same-dimension walls at the same time, so you only pull your tape once for multiple walls. For example, architects often load long hallways with closets that are usually the same size; cutting them and laying them out in one shot is easier, more accurate, and faster than laying them out as you go. It's also common to see repeating wall patter...

Click here to read full article from Tools of the Trade

Related Articles
- How Masonry Buildings Resist Earthquakes Mastic NY
Because masonry buildings usually have many structural wall elements, they tend to be stiff laterally. Because masonry buildings are stiff laterally, even moderate earthquakes can subject them to large shear loads at their base.
- Framer's Guide to Engineered Lumber Mastic NY
- Eliminating Swirls in Precast Panels Mastic NY
- Hidden-Fastener Tool Mastic NY
- Framing Gable and Shed Dormers Mastic NY
- Framing Square Mastic NY