Foolproof Layout Method Plans Hamburg NY

When framing walls in Hamburg, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right.

Local Companies

Jb Tool Rental
(716) 874-7368
785 Sheridan Dr
Tonawanda, NY
Stoll, Russ PE - Clough Harbour & Association LLP
(716) 847-6310
295 Main St Rm 900
Buffalo, NY
Unilock Incorporated
(716) 822-6074
510 Smith St
Buffalo, NY
Lancaster Landscaping
(716) 868-5379
Buffalo, NY
Fairl Landscaping
(716) 446-1810
212 Puritan Rd
Tonawanda, NY
Jeff Petyk Landscaping
(716) 686-9393
5635 Transit Rd
Depew, NY
Four Seasons Landscaping & Snow Plowing
(716) 884-7400
263 Baynes St
Buffalo, NY
Jcs Landscaping
(716) 866-9790
930 West Ave
Buffalo, NY
Jmd Landscaping & Sprinklers
(716) 871-8720
957 Delaware Rd
Buffalo, NY
Grandview Landscaping
(716) 684-7165
114 Pleasant View Dr
Lancasainter, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: November 1, 2003

By Steve Veroneau

Picture these scenarios: You've agonized to measure, double-check, and line up a complicated roofline, but after nailing up the rafters, you notice that the fascia lines are out of whack. Or, you've cut out all of your tair stringers, only to realize they don't fit and now you're racing rush-hour traffic to the lumberyard. Here are a few layout methods with built-in double-checks that can help solve problems before they start.

Layout Direction. When framing walls, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right. The direction doesn't matter as long as it's the same throughout the building, including the second and third floors. Consistent layout direction ensures that studs, rafters, and joists align throughout construction. This makes life easier for installing duct work, pipes, or conduit later, leaving any bay useable as a chase throughout the structure.

Repeating Wall Patterns. Plate and detail any lined-up, same-dimension walls at the same time, so you only pull your tape once for multiple walls. For example, architects often load long hallways with closets that are usually the same size; cutting them and laying them out in one shot is easier, more accurate, and faster than laying them out as you go. It's also common to see repeating wall patter...

Click here to read full article from Tools of the Trade

Related Articles
- How Masonry Buildings Resist Earthquakes Hamburg NY
Because masonry buildings usually have many structural wall elements, they tend to be stiff laterally. Because masonry buildings are stiff laterally, even moderate earthquakes can subject them to large shear loads at their base.
- Hidden-Fastener Tool Hamburg NY
- Framing Gable and Shed Dormers Hamburg NY
- Framing Square Hamburg NY
- Eliminating Swirls in Precast Panels Hamburg NY
- Framer's Guide to Engineered Lumber Hamburg NY