When framing walls in Gloversville, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right.

Local Companies

Aro Lock Shop
(518) 842-1897
212 Division St
Amsainterdam, NY
Sacandaga Yard Services & Landscaping Incorporated
(518) 661-6828
Gloversville, NY
Harnish Brothers Nursery & Pls
(518) 725-1355
132 W State St Ext
Gloversville, NY
SBS Enterprises
(518) 773-0531
138 Summitview Rd
Gloversville, NY
Decker's Landscaping & Nursery
(518) 887-5552
1632 Main St
Pattersonville, NY
Landscaping & Design
(518) 843-7001
1120 Riverfront Ctr
Amsainterdam, NY
City-Cycle
(518) 842-2220
19 Northern Blvd
Amsainterdam, NY
LM Mason Contractors
(518) 725-8893
211 S Main St
Gloversville, NY
Reliable Auto Parts & Hardware
(518) 725-3176
45 Harrison St
Gloversville, NY
Linsco Private Ledger
(518) 725-5054
147 N Main St # 149
Gloversville, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: November 1, 2003

By Steve Veroneau

Picture these scenarios: You've agonized to measure, double-check, and line up a complicated roofline, but after nailing up the rafters, you notice that the fascia lines are out of whack. Or, you've cut out all of your tair stringers, only to realize they don't fit and now you're racing rush-hour traffic to the lumberyard. Here are a few layout methods with built-in double-checks that can help solve problems before they start.

Layout Direction. When framing walls, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right. The direction doesn't matter as long as it's the same throughout the building, including the second and third floors. Consistent layout direction ensures that studs, rafters, and joists align throughout construction. This makes life easier for installing duct work, pipes, or conduit later, leaving any bay useable as a chase throughout the structure.

Repeating Wall Patterns. Plate and detail any lined-up, same-dimension walls at the same time, so you only pull your tape once for multiple walls. For example, architects often load long hallways with closets that are usually the same size; cutting them and laying them out in one shot is easier, more accurate, and faster than laying them out as you go. It's also common to see repeating wall patter...

Click here to read full article from Tools of the Trade

Related Articles
- How Masonry Buildings Resist Earthquakes Gloversville NY
Because masonry buildings usually have many structural wall elements, they tend to be stiff laterally. Because masonry buildings are stiff laterally, even moderate earthquakes can subject them to large shear loads at their base.
- Framing Square Gloversville NY
- Eliminating Swirls in Precast Panels Gloversville NY
- Hidden-Fastener Tool Gloversville NY
- Framer's Guide to Engineered Lumber Gloversville NY
- Framing Gable and Shed Dormers Gloversville NY