Foolproof Layout Method Plans Baldwinsville NY

When framing walls in Baldwinsville, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right.

Local Companies

Jeff's Lawn & Landscaping
(315) 475-8527
404 Scoville Ave
Syracuse, NY
Shandorf Landscaping
(315) 476-6107
107 Janet Dr
Syracuse, NY
Jc Express Landscaping
(315) 560-1871
302 Granville St
Syracuse, NY
A Galeazza & Associates
(315) 423-5304
448 Burnet Ave
Syracuse, NY
Maxian & Horst
(315) 472-2461
306 Hawley Ave
Syracuse, NY
Landscapes East, Inc.
315-682-9044
8012 Saintsville Rd.
Kirkville, NY
Edward M Basta Landscape Architect
(315) 425-0179
136 Walton St # 1
Syracuse, NY
Kozscapes Landscaping
(315) 445-2450
114 Somerset Rd
Syracuse, NY
Yardsmith
(315) 424-7121
308 Burnet Ave
Syracuse, NY
Salt City Energy
(315) 424-9065
101 W Water St
Syracuse, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: November 1, 2003

By Steve Veroneau

Picture these scenarios: You've agonized to measure, double-check, and line up a complicated roofline, but after nailing up the rafters, you notice that the fascia lines are out of whack. Or, you've cut out all of your tair stringers, only to realize they don't fit and now you're racing rush-hour traffic to the lumberyard. Here are a few layout methods with built-in double-checks that can help solve problems before they start.

Layout Direction. When framing walls, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right. The direction doesn't matter as long as it's the same throughout the building, including the second and third floors. Consistent layout direction ensures that studs, rafters, and joists align throughout construction. This makes life easier for installing duct work, pipes, or conduit later, leaving any bay useable as a chase throughout the structure.

Repeating Wall Patterns. Plate and detail any lined-up, same-dimension walls at the same time, so you only pull your tape once for multiple walls. For example, architects often load long hallways with closets that are usually the same size; cutting them and laying them out in one shot is easier, more accurate, and faster than laying them out as you go. It's also common to see repeating wall patter...

Click here to read full article from Tools of the Trade

Related Articles
- Framer's Guide to Engineered Lumber Baldwinsville NY
Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.
- Framing Gable and Shed Dormers Baldwinsville NY
- Eliminating Swirls in Precast Panels Baldwinsville NY
- How Masonry Buildings Resist Earthquakes Baldwinsville NY
- Hidden-Fastener Tool Baldwinsville NY
- Framing Square Baldwinsville NY