Foolproof Layout Method Plans Albany NY

When framing walls in Albany, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right.

Local Companies

Pearl Landscaping Incorporated
(518) 326-4053
Po Box 931
Troy, NY
Small Engine Mobile Medic
(518) 489-5720
65 Russell Ct
Troy, NY
R & S Contractors
(518) 482-5880
396 Central Ave
Albany, NY
Cherry Hill Landscape
(518) 355-8188
107 Nicholas Ct
Schenectady, NY
Skyline Landscaping
(518) 864-7528
2934 Skyline Dr
Schenectady, NY
Sipperly Brothers Landscaping
(518) 785-3181
81 Latham Ridge Rd
Latham, NY
Capital Landscaping
(518) 279-4757
1173 Hoosick Rd
Troy, NY
L & R Landscaping
(518) 782-7172
115 Vermont View Dr
Watervliet, NY
Abele Tractor & Equipment Company
(518) 438-4444
72 Everett Rd
Albany, NY
Williams Landscaping & Lwncr
(518) 388-8588
606 Arbor Ave
Schenectady, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: November 1, 2003

By Steve Veroneau

Picture these scenarios: You've agonized to measure, double-check, and line up a complicated roofline, but after nailing up the rafters, you notice that the fascia lines are out of whack. Or, you've cut out all of your tair stringers, only to realize they don't fit and now you're racing rush-hour traffic to the lumberyard. Here are a few layout methods with built-in double-checks that can help solve problems before they start.

Layout Direction. When framing walls, pull all layout measurements from the same control point, and always move in the same direction, for example, start at the front of the building and always move left to right. The direction doesn't matter as long as it's the same throughout the building, including the second and third floors. Consistent layout direction ensures that studs, rafters, and joists align throughout construction. This makes life easier for installing duct work, pipes, or conduit later, leaving any bay useable as a chase throughout the structure.

Repeating Wall Patterns. Plate and detail any lined-up, same-dimension walls at the same time, so you only pull your tape once for multiple walls. For example, architects often load long hallways with closets that are usually the same size; cutting them and laying them out in one shot is easier, more accurate, and faster than laying them out as you go. It's also common to see repeating wall patter...

Click here to read full article from Tools of the Trade

Related Articles
- Framer's Guide to Engineered Lumber Albany NY
Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.
- Framing Gable and Shed Dormers Albany NY
- Eliminating Swirls in Precast Panels Albany NY
- Hidden-Fastener Tool Albany NY
- How Masonry Buildings Resist Earthquakes Albany NY
- Framing Square Albany NY