Floating a Pergola in Place Nanuet NY

Built by Joseph Cracco and his company, Modern Yankee Builders of Cumberland, R.I., this pergola is 78 feet long: 60 feet is curved and supported by steel columns, and 18 feet (the construction of which is another story) runs along the screened porch.

Local Companies

Craig Custom Builders
144 Osceola Rd
Wayne, NJ
Franzoso Contracting
33 Croton Point Ave.
Croton-on-Hudson, NY
Cifuni Robert E
(845)268-7969
327 North Route 9W
Congers, NY
Hickory Hollow Nursery & Garden Center
(845)351-7226
713 Route 17
Tuxedo Park, NY
Midway Electric
(718)231-3210
170 Rosedale Road
Yonkers, NY
Len Van Builders
31 Stalter Drive
Wayne, NJ
Paragon Installers, LLC
556 N. Route 17
Paramus, NJ
Prolawn Spray Svce Inc
(914)237-5252
1470 Midland Av
Bronxville, NY
G R Landscaping
(845)356-6979
55 Briarcliff Dr
Monsey, NY
Espaces Verts Inc
(914)761-7648
23 Buckout Road
White Plains, NY
Data Provided by:
  

Focus on good design and clever construction

by Laurie Elden

Built by Joseph Cracco and his company, Modern Yankee Builders of Cumberland, R.I., this pergola is 78 feet long: 60 feet is curved and supported by steel columns, and 18 feet (the construction of which is another story) runs along the screened porch. Cracco did exhaustive research into epoxies and made trial runs to determine how best to lay out, glue, and clamp clear cedar to laminate the 60-foot curved beam on site, no small feat in cool April weather. Choosing lap joints for gluing together the lengths of 1x2s (atop the purlins) cost an extra 40 man hours, as the wood split at the joints when the pieces were bent, and the crew had to reglue using scarf joints. Even so, the assembly was ready right on schedule for the crane, which lifted the structure while the crew placed the columns underneath. To see more photos of this project, go to “ Complex Pergola Details ,” a PDBWebExclusive at deckmagazine.com . — Laurie Elden


Photo credit: Joseph Cracco


Photo credit: Joseph Cracco


Photo credit: Gary Moyer


Photo credit: Gary Moyer


Photo credit: Joseph Cracco

Related Articles

Click here to read full article from Deck Magaziner

Related Articles
- Finishing Concrete Nanuet NY
Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.
- Home Improvement Product Reviews Nanuet NY
- Flue Liners for Masonry Chimneys Nanuet NY
- How to Handle and Decrease Customer Disputes Nanuet NY
- Drywall Finishing Nanuet NY
- Festool Circ Saw and Guide Rail System Nanuet NY
- Drape Wall and Cloak Wall Nanuet NY
- Energy-Efficient Lighting Controls Nanuet NY
- Framing a Pergola Nanuet NY
- Fending off Sun, Wind, and Nosy Neighbors Nanuet NY