Flashing Factors Peekskill NY

Rowlock brick sills contain many joints and are particularly susceptible to water penetration. For this reason, I do not recommend their use in freeze-thaw environments in Peekskill.

Local Companies

ilias painting and paper hanging inc
845-282-9066
53 rodeo dr
hopewell jct, NY
New York State Construction
(845) 641-3382
7 Skyline Dr
Thiells, NY
hk contracting inc.
914 473 2355
po box 529
scrub oak, NY
A. Prokosch & Sons/Pro-Air Heating & Air Conditioning
845-913-7191
772 South Street
Newburgh, NY
Mc Auliffe Construction Co
845-225-1746 or 914-419-7101
Po Box 810 Carmel, NY.
Carmel, NY
On Time Remodeling, Corp
(845) 825-4470
21A Lafayette Street
Spring Valley, NY
Custom Crushing & Materials, Inc.
914.737.6400
522 N. State Rd.
Briarcliff Manor, NY
MV custom inc
845 2262375
803 beekman road
hopewell jct, NY
mv custom inc mvcustominc.com
845 226-2375
803 beekman road
hopewell jct, NY
jmc:contracting work corp
1914 672 7119
627 highland ave
peekskill, NY

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: October 1, 2005

Should flashing be used beneath rowlock brick window sills? If through-wall flashing is installed beneath these rowlocks, how are the sills anchored? If the anchors penetrate the flashing, does this lead to deterioration of the masonry below in freeze-thaw environments?

Rowlock brick sills contain many joints and are particularly susceptible to water penetration. For this reason, I do not recommend their use in freeze-thaw environments.

When they are used in freeze-thaw environments, however, the flashing beneath them is critical to prevent water from saturating the top of the masonry wall below. Snow and ice collects on the rowlock sills. When they melt, water can penetrate the sills and refreeze, resulting in deterioration. This scenario is a particular problem with the anchorage of these sills because they break apart.

When rowlock sills are used, they can be anchored using galvanized corrugated wall ties in the head joint between every fourth to sixth brick unit. When possible, I prefer that these anchors be attached to the backup wall on the vertical face, behind the sill.

It also is possible to extend flat strap anchors through the flashing. However, any penetrations through the flashing must be carefully sealed.

Click here to read full article from Masonry Construction

Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details