Flashing Factors North Tonawanda NY

Rowlock brick sills contain many joints and are particularly susceptible to water penetration. For this reason, I do not recommend their use in freeze-thaw environments in North Tonawanda.

Local Companies

Tonawanda Coke Corporation
(716) 876-6222
PO Box 5007
Tonawanda, NY
Sherex Industries, Ltd.
(716) 875-0176
400 Riverwalk Pkwy., Ste. 600
Tonawanda, NY
Lamparelli Construction Co., Inc.
(716) 891-8599
590 Kennedy Rd.
Cheektowaga, NY
Highland Masonry Restoration, Inc.
(716) 712-0781
33 Ransier Dr.
West Seneca, NY
McKesson
(716) 677-7600
2700 North America Dr.
West Seneca, NY
A+ Contractors of WNY
716-568-4198
3840 E. Robinson Rd. #226
Amherst, NY
National Electric Construction Co., Inc.
(716) 881-1503
PO Box 130
Buffalo, NY
Lake Side Contracting Co., Inc.
(716) 681-6260
3198 Union Rd., Ste. 500
Cheektowaga, NY
Sullivan Landscaping
(716) 839-4584
196 Darwin Dr.
Amherst, NY
Warehouse Wholesaler.com
(716) 947-5552
3774 Lake Shore Rd.
Buffalo, NY

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: October 1, 2005

Should flashing be used beneath rowlock brick window sills? If through-wall flashing is installed beneath these rowlocks, how are the sills anchored? If the anchors penetrate the flashing, does this lead to deterioration of the masonry below in freeze-thaw environments?

Rowlock brick sills contain many joints and are particularly susceptible to water penetration. For this reason, I do not recommend their use in freeze-thaw environments.

When they are used in freeze-thaw environments, however, the flashing beneath them is critical to prevent water from saturating the top of the masonry wall below. Snow and ice collects on the rowlock sills. When they melt, water can penetrate the sills and refreeze, resulting in deterioration. This scenario is a particular problem with the anchorage of these sills because they break apart.

When rowlock sills are used, they can be anchored using galvanized corrugated wall ties in the head joint between every fourth to sixth brick unit. When possible, I prefer that these anchors be attached to the backup wall on the vertical face, behind the sill.

It also is possible to extend flat strap anchors through the flashing. However, any penetrations through the flashing must be carefully sealed.

Click here to read full article from Masonry Construction