Finishing Concrete White Plains NY

Power floating in White Plains embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

CEKInt.
(917) 477-8175---(917) 657-1389
600 West 115 Street
NYC, NY
170 East End Ave Construction Llc
(212) 288-1114
534 E 88th St
New York, NY
NY Construction & Stone Inc.
718 204-6100
2145, 23 Street
Astoria, NY
Van Go General Contracting
(201) 387-9013
326 So. Washington Ave
Bergenfield, NJ
Kilpatrick Contractor
(914) 236-5421
49 Huber Place
Yonkers, NY
McFarlane Brothers Asphalt Paving
201-327-5258
120 East Main St. Suite 337
Ramsey, NJ
Arcs Construction Service
(212) 722-2110
309 E 103rd St
New York, NY
Green Tree Construstion
201.300.6906
33 Broadway
Fair Lawn, NJ
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Siller Stairs
(347) 491-3833
18-12 130th Street
New York, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Articles
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details