Power floating in West Hempstead embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

Dream Awnings & Signs
(718) 707-0140
36-07 21Street
Long Island City, NY
NY Construction & Stone Inc.
718 204-6100
2145, 23 Street
Astoria, NY
Hanforged Iron Works
646-302-9335
5600 Grand Avenue
Maspeth, NY
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
trinchese iron works
(718) 843-0451
3375 royal ave
oceanside, NY
Darren Construction Services, Ltd.
516-433-9000
9 Gerhard Rd.
Plainview, NY
Window Designs by Suzi
(914) 636-6859
23 Stephenson Blvd.
New Rochelle, NY
Niwa International
917-929-5369
123-50 Lax Ave.
College Point, NY
DL Restoration & Builders Corp
718 275 3995
107-12 71st Road
Forest Hills, NY
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Articles
- Formwork Rust West Hempstead NY
Steel formwork is used in prefabrication operations because of its robustness and reusability, as well as its ability to produce prefabricated units with smooth surfaces. On these steel molds, brownish-reddish rust spots sometimes form while the concrete hardens. This rust could lead to brown or red spotty discolorations on the concrete surface lower the concrete element's appearance, Fig. 1 .
- In Style with Tile West Hempstead NY
- Fibers for Permeability West Hempstead NY
- Galvanized Wall Ties West Hempstead NY
- Green Construction West Hempstead NY
- Galvanized Wall Ties West Hempstead NY
- Fiber Reinforced Concrete West Hempstead NY
- Eliminating Swirls in Precast Panels West Hempstead NY
- Incorrect Testing Practices West Hempstead NY
- Form-Release Agents West Hempstead NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details