Finishing Concrete Staten Island NY

Power floating in Staten Island embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

new age roofing
718-626-0027
60-74 70 street
maspeth, NY
Bayada Nurses
(212) 354-9400
252 West 38th Street
New York, NY
CWC Plumbing and Heating LLC
718-268-8898
90-04A 70th Avenue
Forest Hills, NY
M&M Construction Specialist
908-378-5951
1210 Liberty Avenue
Hillside, NJ
Davis Construction Inc
908-601-0444
847 Leonardville Rd
middletown, NJ
Arcs Construction Service
(212) 722-2110
309 E 103rd St
New York, NY
MBC GENERAL CONSTRUCCION
732 558 54 49
330 SUMMIT AV
PERTH AMBOY, NJ
Design Build NJ LLC
973-743-3308
31 Pitt St
Bloomfield, NJ
LSB Construction, Inc.
(917) 338-4960
1590 York Avenue, Suite 3B
New York, NY
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Articles
- Formwork Rust Staten Island NY
Steel formwork is used in prefabrication operations because of its robustness and reusability, as well as its ability to produce prefabricated units with smooth surfaces. On these steel molds, brownish-reddish rust spots sometimes form while the concrete hardens. This rust could lead to brown or red spotty discolorations on the concrete surface lower the concrete element's appearance, Fig. 1 .
- Galvanized Wall Ties Staten Island NY
- Fibers for Permeability Staten Island NY
- Form-Release Agents Staten Island NY
- In Style with Tile Staten Island NY
- Fiber Reinforced Concrete Staten Island NY
- Green Construction Staten Island NY
- Galvanized Wall Ties Staten Island NY
- Eliminating Swirls in Precast Panels Staten Island NY
- Incorrect Testing Practices Staten Island NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details