Finishing Concrete Sayville NY

Power floating in Sayville embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

all stone restoration
631 780 5404
po box 115
smithtown ny, NY
Good Earth Sales
516-818-2746
po box 711
medford, NY
Pro Qualtiy Home Improvements Inc.
631 393 6812
500 Bi-County Blvd.
Farmingdale, NY
Danic Concrete Corp
(631) 234-3210
240 Gibbs Rd
Central Islip, NY
Wayne Block Co Inc
(716) 683-4675
142 Sawyer Ave
Depew, NY
Truckloaders
631-872-2275
West Jericho Tpk
Smithtown, NY
Autumn Masonry
631-828-1687
10 Locust Avenue
Coram, NY
JC Homecare
631 756 5600
200 Rt 110
Farmingdale, NY
Building Structures Unlimited
888-492-1136
17 Reservoir Road Suite 3A
Melville, NY
P & R Masonry & Concrete Inc
(631) 732-8621
42 N Morris Ave
Farmingville, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Articles
- Incorrect Testing Practices Sayville NY
Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.
- Formwork Rust Sayville NY
- Fiber Reinforced Concrete Sayville NY
- Form-Release Agents Sayville NY
- Fibers for Permeability Sayville NY
- Green Construction Sayville NY
- Galvanized Wall Ties Sayville NY
- In Style with Tile Sayville NY
- Eliminating Swirls in Precast Panels Sayville NY
- Galvanized Wall Ties Sayville NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details