Finishing Concrete Rosedale NY

Power floating in Rosedale embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

American Construction Corp
(212) 229-5200
44 W 18th St
New York, NY
Msa Quality Rubbish removal company
347-400-1141
200 knapp st
brooklyn, NY
N & M Demolition Inc
(718) 965-8024
992 4th Avenue
Brooklyn, NY
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Haroon Contracting Inc
(646) 667-5381
1578 williamsbridge road
bronx, NY
A Fg Construction Management Inc
(212) 897-2674
450 7th Ave
New York, NY
Studio 22 Architecture PC
(212) 988-1067
191 E. 76th Street
New York, NY
LSB Construction, Inc.
(917) 338-4960
1590 York Avenue, Suite 3B
New York, NY
Citi Skyline contractors inc.
(917) 583-3312
68-01 Forest avenue
Ridgewood, NY
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Articles
- Green Construction Rosedale NY
Sustainable building practices are gaining acceptance in the competitive world of concrete construction. The editors of Concrete Construction and The Concrete Producer have created a new award program to recognize the concrete community's innovative contributions to green building.
- Fibers for Permeability Rosedale NY
- Eliminating Swirls in Precast Panels Rosedale NY
- Galvanized Wall Ties Rosedale NY
- In Style with Tile Rosedale NY
- Formwork Rust Rosedale NY
- Fiber Reinforced Concrete Rosedale NY
- Incorrect Testing Practices Rosedale NY
- Form-Release Agents Rosedale NY
- Galvanized Wall Ties Rosedale NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details