Finishing Concrete Middletown NY

Power floating in Middletown embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

Abar Sewer Service, Inc.
845-294-5314
25 Green Street
Goshen, NY
Allegro Landscaping
845-294-8119
32 Parkway
Goshen, NY
Dougherty Concrete
845-386-8800
PO BOX 70
Bloomingburg, NY
Ohioville Acres
(845) 255-4554
26 Cook Lane
Gardiner, NY
Robert Waltke & Son, LLC
(845) 895-2238
46 Sycamore Drive
Wallkill, NY
LAN Associates
845-615-0350
252 Main Street
Goshen, NY
Esposito & Associates
845-294-0558
262 Greenwich Avenue
Goshen, NY
Trottown Trucking, Inc.
845-591-5026
1 McNamara Lane
Goshen, NY
A. Prokosch & Sons/Pro-Air Heating & Air Conditioning
845-913-7191
772 South Street
Newburgh, NY
Trapps Builders Inc.
(845) 895-1782
199 Denniston Rd.
Wallkill, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.