Finishing Concrete Islip NY

Power floating in Islip embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

Darren Construction Services, Ltd.
516-433-9000
9 Gerhard Rd.
Plainview, NY
Good Earth Sales
516-818-2746
po box 711
medford, NY
slr general construction
1646 420 2006
173 morton blvd
plainview, NY
JC Homecare
631 756 5600
200 Rt 110
Farmingdale, NY
Total Home Construction Corp (since 1989)
(516) 822-4747
1120 Old Country Rd
Plainview, NY
Truckloaders
631-872-2275
West Jericho Tpk
Smithtown, NY
all stone restoration
631 780 5404
po box 115
smithtown ny, NY
Gorilla Contracting
516-945-7850
27 wood avenue
massapequa, NY
VISCO ASBESTOS REMOVAL
516 547 2510
235 ROBINS LA
SYOSSET, NY
Pro Qualtiy Home Improvements Inc.
631 393 6812
500 Bi-County Blvd.
Farmingdale, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Articles
- Formwork Rust Islip NY
Steel formwork is used in prefabrication operations because of its robustness and reusability, as well as its ability to produce prefabricated units with smooth surfaces. On these steel molds, brownish-reddish rust spots sometimes form while the concrete hardens. This rust could lead to brown or red spotty discolorations on the concrete surface lower the concrete element's appearance, Fig. 1 .
- Fibers for Permeability Islip NY
- Galvanized Wall Ties Islip NY
- Green Construction Islip NY
- In Style with Tile Islip NY
- Galvanized Wall Ties Islip NY
- Incorrect Testing Practices Islip NY
- Form-Release Agents Islip NY
- Fiber Reinforced Concrete Islip NY
- Eliminating Swirls in Precast Panels Islip NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details