Finishing Concrete Far Rockaway NY

Power floating in Far Rockaway embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

B & B Construction
(212) 661-6008
420 Lexington Ave
New York, NY
Crystal Glass & Mirror Corp.
718-234-1218
159 21st Street
Brooklyn, NY
Niwa International
917-929-5369
123-50 Lax Ave.
College Point, NY
Imperial Construction
(201) 985-3975
769 Montgomery St
Jersey City, NJ
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
Atria Builder
(212) 876-2756
330 E 109th St
New York, NY
new age roofing
718-626-0027
60-74 70 street
maspeth, NY
Msa Quality Rubbish removal company
347-400-1141
200 knapp st
brooklyn, NY
Vintage Homes, Inc.
917-642-2390
15 Cuttermill Road
Great Neck, NY
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Articles
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details