Finishing Concrete Dunkirk NY

Power floating in Dunkirk embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

Ferrara Brothers Building Material Corp
(718) 707-9804
5722 49th St
Maspeth, NY
F J Concrete Corp
(631) 234-0164
19 Hawthorne Ave
Central Islip, NY
Presti Ready Mix Concrete Inc
(516) 378-6006
210 E Merrick Rd
Freeport, NY
USA Concrete
(845) 361-9828

Middletown, NY
F & M Concrete Corp
(845) 352-9019
10 Hoffman St
Spring Valley, NY
Roman Concrete Corp
(631) 499-8542
285 Commack Rd
Commack, NY
Ac D Concrete
(716) 881-9747
525 Auburn Ave
Buffalo, NY
A & A Enterprises Inc
(631) 580-2725
1087 Terry Rd
Ronkonkoma, NY
Coretech Concrete Cutting
(845) 783-1850

Monroe, NY
Ferrucci Nunzio
(716) 893-6122
42 Lackawanna Ave
Sloan, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Articles
- Form-Release Agents Dunkirk NY
Form-release agents or form oils represent only a small fraction of the cost of a manufactured concrete item, but they have a big influence on the quality and appearance of the concrete surface.
- Galvanized Wall Ties Dunkirk NY
- Green Construction Dunkirk NY
- Fiber Reinforced Concrete Dunkirk NY
- Galvanized Wall Ties Dunkirk NY
- In Style with Tile Dunkirk NY
- Formwork Rust Dunkirk NY
- Incorrect Testing Practices Dunkirk NY
- Fibers for Permeability Dunkirk NY
- Eliminating Swirls in Precast Panels Dunkirk NY