Finishing Concrete Cortlandt Manor NY

Power floating in Cortlandt Manor embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

Mr. Handyman
914-461-3400
719 West Nyack Rd
West Nyack, NY
On Time Remodeling, Corp
(845) 825-4470
21A Lafayette Street
Spring Valley, NY
Custom Crushing & Materials, Inc.
914.737.6400
522 N. State Rd.
Briarcliff Manor, NY
A. Prokosch & Sons/Pro-Air Heating & Air Conditioning
845-913-7191
772 South Street
Newburgh, NY
Mc Auliffe Construction Co
845-225-1746 or 914-419-7101
Po Box 810 Carmel, NY.
Carmel, NY
Access Nursing Services
(914) 747-9696
411 Manville Road
Pleasanville, NY
MCFARLANE PAVING
201-327-1591
23 BRIARCLIFF RD
UPPERSADDLE RIVER, NJ
fabian nova
(914) 843-2838
32 maple av
mt kisco, NY
New York State Construction
(845) 641-3382
7 Skyline Dr
Thiells, NY
jmc:contracting work corp
1914 672 7119
627 highland ave
peekskill, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details