Finishing Concrete Astoria NY

Power floating in Astoria embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present.

Local Companies

Bayada Nurses
(212) 354-9400
252 West 38th Street
New York, NY
GREAT AMERICAN COLORS LLC - CONTRACTORS
(201) 440-0505
730 GRAND AVE
RIDGEFIELD, NJ
AM Shield Waterpoofing
516 294-8400
33 Albertson Ave.
Albertson, NY
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
Haroon Contracting Inc
(646) 667-5381
1578 williamsbridge road
bronx, NY
SERVPRO of Hoboken/Union City
201-805-7263
PO Box 393
Hoboken, NJ
Omnibuild, LLC
(212) 419-1930
29 Broadway
New York, NY
Innovate Stones Marble & Granite
908 718 5616
720 E Elizabeth ave
Linden, NJ
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Van Go General Contracting
(201) 387-9013
326 So. Washington Ave
Bergenfield, NJ
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2004

By Bob Simonelli, El Nuevo Constructor

Finishing concrete has always been about good timing: being in the right place at the right time with the right tool. Now, with the widespread acceptance of the F-number system that rates flatness, proper power troweling techniques are essential since floor flatness (FF value) depends directly on a finisher's ability to run trowel machines.

The Right Tool and Time

Power floating embeds the large aggregate just beneath the surface of the mortar, removes surface irregularities, and compacts the concrete while it consolidates mortar at the surface in preparation for other finishing operations. The timing of when you should power float a floor is critical. The rule of thumb on when a slab is ready for the power float is that your footprint should only be 1/4-inch deep or less, with little or no bleed- water present. Most floors that do not end up being very flat (resulting in low F-numbers) are the direct result of finishers getting on to a floor too early with power trowels and creating lumps and bumps. Remember, at this point the concrete is in its most plastic state that the floor will be in during a power floating sequence. Timing is everything-poor timing causes finishing problems. Also remember that any finishing operation done while there is excess moisture or bleed-water on the surface can cause dusting or scaling after the concrete cures.

Click here to read full article from Tools of the Trade

Related Articles
- Incorrect Testing Practices Astoria NY
Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.
- Fibers for Permeability Astoria NY
- Formwork Rust Astoria NY
- Eliminating Swirls in Precast Panels Astoria NY
- Form-Release Agents Astoria NY
- Galvanized Wall Ties Astoria NY
- Green Construction Astoria NY
- Galvanized Wall Ties Astoria NY
- Fiber Reinforced Concrete Astoria NY
- In Style with Tile Astoria NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details