FHA Design and Construction Tarrytown NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Tarrytown. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

JoAnne Cone Architect
(203)322-5782
127 Apple Valley Rd,
Stamford, CT
LAN Associates
445 Godwin Avenue
Midland Park, NJ
Concezio Petrella Architect
401 Grand Avenue
Leonia, NJ
Donald Rubin, AIA
91 Clairmont Avenue
Westwood, NJ
Tast & Clemency Architects PC
11 Village Square
Glen Cove, NY
ADG Construction LLc.
(201) 446-9491
307 Dorothy Street
Fair Lawn, NJ
Architectura, Inc.
935 River Road,Suite 100
Edgewater, NJ
Thomas V. Ashbahian Architect Engineer Planner
39 Spring Street
Ramsey, NJ
Heritage Architecture, LLC.
(201)262-3800
352 Evelyn Street,Suite 2
Paramus, NJ
Warshauer Mellusi Warshauer Architects
7 Skyline Drive
Hawthorne, NY
Data Provided by:
  

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- Green Construction Tarrytown NY
Sustainable building practices are gaining acceptance in the competitive world of concrete construction. The editors of Concrete Construction and The Concrete Producer have created a new award program to recognize the concrete community's innovative contributions to green building.
- How Masonry Buildings Resist Earthquakes Tarrytown NY
- Hand-Held Power Saws Tarrytown NY
- How to Choose a Grout Vibrator Tarrytown NY
- Floating a Pergola in Place Tarrytown NY
- High Cement Content Problems Tarrytown NY
- Grout Pumps Tarrytown NY
- Framing Square Tarrytown NY
- Graphisoft EcoDesigner Tarrytown NY
- Franchise Fundamentals Tarrytown NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details