FHA Design and Construction Riverhead NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Riverhead. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

Sherwood Architect
PO Box 1681
Sag Harbor, NY
Ira Haspel Architect PC
59945 Route 25
Southold, NY
Robert Higgins Architects
50 Hidden Acres Path
Wading River, NY
Peter E. Tokar Architect
3718 Sound Avenue
Riverhead, NY
Keri Kazel Architect P.C.
27 Frank Avenue
Yaphank, NY
Maxine Nachtigal Liao Architect
(631)725-9321
12 Jesse Halsey Lane
Sag Harbor, NY
Stephen A Rossetti Architect
30 Warfield Way
Southampton, NY
V. Design Architects PLLC.
17 Rolling Hill Drive
Patchogue, NY
Vanguard Inspections, Inc.
16 Sequoia Drive
Coram, NY
Stelle Architects
(631)537-0019
48 Foster Ave,PO Box 3002
Bridgehampton, NY

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- Grout Pumps Riverhead NY
The GHP 2000 pump handles grout or shotcrete, and is effective in grouting small ICF projects. The product is powered by a 20-hp gasoline engine and delivers 7 cu yd of grout/hr. It has a peristaltic pump, comes with built-in jack stands to stabilize the machine, and weighs 1000 lb.
- How Masonry Buildings Resist Earthquakes Riverhead NY
- Green Construction Riverhead NY
- Floating a Pergola in Place Riverhead NY
- Franchise Fundamentals Riverhead NY
- Hand-Held Power Saws Riverhead NY
- Graphisoft EcoDesigner Riverhead NY
- High Cement Content Problems Riverhead NY
- Framing Square Riverhead NY
- How to Choose a Grout Vibrator Riverhead NY