FHA Design and Construction Penfield NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Penfield. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

Blake H. Held, Architect
73 Taylor Road
Honeoye Falls, NY
Mitchell Architecture
5800 Pitttsford-Palmyra Road,P.O. Box #1058
Pittsford, NY
Smith+Associates Architects, PLLC
263 Central Ave
Rochester, NY
Hunt Engineers & Architects
4 Commercial Street,Suite 300
Rochester, NY
9x30 Design
62 Westland Avenue
Rochester, NY
Integrative Design & Architecture
38 Nelson Street
Rochester, NY
Tetra Tech Architect & Engineers
1000 Pittsford Victor Road
Pittsford, NY
Barkstrom & Lacroix Architects
50 Chestnut Street
Rochester, NY
Chaintreuil Jensen & Stark Architects
54 S Union St
Rochester, NY
LaBella Associates, P.C.
585-454-6110
300 State Street, Suite 201
Rochester, NY

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- How to Choose a Grout Vibrator Penfield NY
Using a puddling stick to consolidate grout is no longer acceptable in most building codes. Changing codes now require that grout pours greater than 12 inches be both consolidated and reconsolidated by mechanical vibration.
- Graphisoft EcoDesigner Penfield NY
- Floating a Pergola in Place Penfield NY
- High Cement Content Problems Penfield NY
- Grout Pumps Penfield NY
- Franchise Fundamentals Penfield NY
- Hand-Held Power Saws Penfield NY
- How Masonry Buildings Resist Earthquakes Penfield NY
- Green Construction Penfield NY
- Framing Square Penfield NY