FHA Design and Construction Ogdensburg NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Ogdensburg. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

Conway Construction
(607) 347-4417
1465 Dryden Rd
Freeville, NY
Map Enterprises
(845) 277-2363
236 Hardscrabble Rd
North Salem, NY
Jersey Tank Fabricatiors
(718) 917-6500
1 Jfk Airport
Jamaica, NY
Rainier Group
(718) 539-0612
3202 Linden Pl
Flushing, NY
Inner City Development
(212) 289-0881
309 E 94th St
New York, NY
Scientific Construction Co
(718) 937-7475
4725 34th St
Long Island City, NY
Santucci Construction Corp
(914) 736-0293
2064 E Main St
Cortlandt Manor, NY
Casabella Construction Corp
(718) 545-5501
1962 Hazen St
East Elmhurst, NY
Bnl Construction Corp
(516) 739-1511
150 Lincoln Ave
Mineola, NY
Greenfield Corporation the
(212) 873-4004
201 W 70th St Apt 34F
New York, NY

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- Grout Pumps Ogdensburg NY
The GHP 2000 pump handles grout or shotcrete, and is effective in grouting small ICF projects. The product is powered by a 20-hp gasoline engine and delivers 7 cu yd of grout/hr. It has a peristaltic pump, comes with built-in jack stands to stabilize the machine, and weighs 1000 lb.
- How to Choose a Grout Vibrator Ogdensburg NY
- Framing Square Ogdensburg NY
- Franchise Fundamentals Ogdensburg NY
- High Cement Content Problems Ogdensburg NY
- Green Construction Ogdensburg NY
- Graphisoft EcoDesigner Ogdensburg NY
- Hand-Held Power Saws Ogdensburg NY
- Floating a Pergola in Place Ogdensburg NY
- How Masonry Buildings Resist Earthquakes Ogdensburg NY