FHA Design and Construction Nanuet NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Nanuet. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

R.C. Keller & Associates
(973)694-8810
31 Corvair Place Suite 110
Wayne, NJ
WJCA Incorporated
763 Susquehanna Avenue
Franklin Lakes, NJ
John Cohen, AIA
397 Summit Avenue
Hackensack, NJ
Pilat Davis Architecture
219 Rockingstone Avenue
Larchmont, NY
Sapinsley Architecture
440 Riverside Dr.,Suite 121
New York, NY
ADG Construction LLc.
(201) 446-9491
307 Dorothy Street
Fair Lawn, NJ
Thomas F. Ercolano, Architect
(973)746-5595
202 Highland Avenue
Montclair, NJ
Robert A. Kruse, AIA
157 Lincoln Ave.
Ridgewood, NJ
Andrew M. Fethes Architecture
893 Woodland Ave.
Oradell, NJ
Baldwin & Franklin Architects
73 Washington Avenue
Hastings on Hudson, NY
Data Provided by:
    

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- Grout Pumps Nanuet NY
The GHP 2000 pump handles grout or shotcrete, and is effective in grouting small ICF projects. The product is powered by a 20-hp gasoline engine and delivers 7 cu yd of grout/hr. It has a peristaltic pump, comes with built-in jack stands to stabilize the machine, and weighs 1000 lb.
- Framing Square Nanuet NY
- How to Choose a Grout Vibrator Nanuet NY
- Green Construction Nanuet NY
- How Masonry Buildings Resist Earthquakes Nanuet NY
- High Cement Content Problems Nanuet NY
- Graphisoft EcoDesigner Nanuet NY
- Franchise Fundamentals Nanuet NY
- Hand-Held Power Saws Nanuet NY
- Floating a Pergola in Place Nanuet NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details