FHA Design and Construction Monroe NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Monroe. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

Da Collins Construction Co
(518) 758-3265

Niverville, NY
Frost G F Construction Co Inc
(315) 488-0950
5229 E Foxhill Ln
Camillus, NY
Soho Restoration Co
(718) 389-3550
104 Calyer St
Brooklyn, NY
Crescents Consulting
(914) 788-9245
2 Stowe Rd
Peekskill, NY
All Season Construction
(518) 295-7855
322 Main St
Schoharie, NY
Verticon Ltd
(845) 774-8500
24 Gilbert St Ext
Monroe, NY
Loden Robert M Ltd
(518) 295-6440
115 State Route 30A
Schoharie, NY
Forever Construction & Decoration Corp
(718) 886-0418
3360 Prince St
Flushing, NY
Interior Building Services Inc
(212) 768-0026
247 W 37th St Rm 1200
New York, NY
T J Piping Heating & Construction Co
(718) 574-5102
1441 Bushwick Ave
Brooklyn, NY

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- Framing Square Monroe NY
When someone says "framing square," we all probably think of the same object. But before it became a mass-produced tool in early 19th century America–and the tool we all think of–medieval European timber framers used framing squares to lay out bents and ribbed vaults for houses and cathedrals.
- Hand-Held Power Saws Monroe NY
- High Cement Content Problems Monroe NY
- How Masonry Buildings Resist Earthquakes Monroe NY
- Green Construction Monroe NY
- Franchise Fundamentals Monroe NY
- Graphisoft EcoDesigner Monroe NY
- Floating a Pergola in Place Monroe NY
- How to Choose a Grout Vibrator Monroe NY
- Grout Pumps Monroe NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details