FHA Design and Construction Massapequa Park NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Massapequa Park. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

Massapequa Park, NJ
Good Samaritan Hospital Medical Center
1000 Montauk Highway
West Islip, NY
Gavosto Associates Inc.
16 Beatrice Lane
Glen Cove, NY
Michael Anthony D'Aconti Architects
5036 Jericho Turnpike
Commack, NY
ADL III Architecture P.C.
24 Woodbine Avenue,Suite 1
Northport, NY
Alure Home Improvements
1999 Hempstead Turnpike
East Meadow, NY
Joel H. Cooper, AIA
16 Ann Dr.
Syosset, NY
Carriage Hill Associates
299 Duffy Avenue
Hicksville, NY
125 Mineola Ave.,Suite 306
Roslyn Heights, NY
Sear Brown
201 Old Country Road,Suite 311
Melville, NY
Data Provided by:

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- Framing Square Massapequa Park NY
When someone says "framing square," we all probably think of the same object. But before it became a mass-produced tool in early 19th century America–and the tool we all think of–medieval European timber framers used framing squares to lay out bents and ribbed vaults for houses and cathedrals.
- How Masonry Buildings Resist Earthquakes Massapequa Park NY
- Graphisoft EcoDesigner Massapequa Park NY
- Grout Pumps Massapequa Park NY
- Floating a Pergola in Place Massapequa Park NY
- Franchise Fundamentals Massapequa Park NY
- Green Construction Massapequa Park NY
- Hand-Held Power Saws Massapequa Park NY
- How to Choose a Grout Vibrator Massapequa Park NY
- High Cement Content Problems Massapequa Park NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details