FHA Design and Construction Glen Cove NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Glen Cove. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

CEK International
(646) 468-4223
600 West 115 Street
New York, NY
Tracey Arne Brown, Architect
66 Sinawoy Rd,
Cos Cob, CT
KCG Architects
21 Grand Avenue,Suite 106
Palisades Park, NJ
Dennis Noskin Architect PC
(914)684-2456
55 South Broadway
Tarrytown, NY
Frank S. Smith Architect, PC
514 Larkfield Road
East Northport, NY
Alure Home Improvements
1999 Hempstead Turnpike
East Meadow, NY
NEW YORK CITY BEST CONSTRUCTION CORP.
347-26-9950
25 BEECHWOOD PLACE
Massapequa Park, NJ
Mockler Taylor Architects, LLC
125 Greenwich Ave,
Greenwich, CT
Hoene Architects
(845)359-6723
379 Piermont Ave
Piermont, NY
GNA Architectural & Design, Inc.
575 Madison Avenue,23rd Floor
New York, NY
Data Provided by:
    

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- Graphisoft EcoDesigner Glen Cove NY
Graphisoft EcoDesigner is an integrated, easy-to-use energy evaluation tool for architects. EcoDesigner enables architects to control the energy consumption of their buildings, and sets new standards in sustainable design, making ArchiCAD the leading software solution for contemporary architectural demands.
- How Masonry Buildings Resist Earthquakes Glen Cove NY
- High Cement Content Problems Glen Cove NY
- Grout Pumps Glen Cove NY
- Floating a Pergola in Place Glen Cove NY
- Green Construction Glen Cove NY
- Framing Square Glen Cove NY
- Franchise Fundamentals Glen Cove NY
- Hand-Held Power Saws Glen Cove NY
- How to Choose a Grout Vibrator Glen Cove NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details