FHA Design and Construction Bethpage NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Bethpage. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

NEW YORK CITY BEST CONSTRUCTION CORP.
347-26-9950
25 BEECHWOOD PLACE
Massapequa Park, NJ
Mario R. Vergara Architect PC
200 Jericho Turnpike
Floral Park, NY
Reilly + Associates Architects
273 Sea Cliff Avenue
Sea Cliff, NY
Anthony Szekalski Architect
12 Sunset Road
Bay Shore, NY
Thomas D. Blore Architect, P.C.
88 Fairview Avenue
Islip Terrace, NY
Alure Home Improvements
1999 Hempstead Turnpike
East Meadow, NY
Marsella + Knoetgen Architects
154 East Boston Post Road
Mamaroneck, NY
Robert O'Shea Architect
821 West Jericho Pike
Smithtown, NY
JMK Architectural Service, P.C.
5 Todd Court
East Williston, NY
Sear Brown
201 Old Country Road,Suite 311
Melville, NY
Data Provided by:
    

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- How to Choose a Grout Vibrator Bethpage NY
Using a puddling stick to consolidate grout is no longer acceptable in most building codes. Changing codes now require that grout pours greater than 12 inches be both consolidated and reconsolidated by mechanical vibration.
- Hand-Held Power Saws Bethpage NY
- Grout Pumps Bethpage NY
- Framing Square Bethpage NY
- Floating a Pergola in Place Bethpage NY
- Graphisoft EcoDesigner Bethpage NY
- How Masonry Buildings Resist Earthquakes Bethpage NY
- High Cement Content Problems Bethpage NY
- Franchise Fundamentals Bethpage NY
- Green Construction Bethpage NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details