FHA Design and Construction Amsterdam NY

Don't fall for the most common misconceptions of the FHA design and construction requirements in Amsterdam. Follow these 10 tips to ensure you're on the right track. Read on and find more information!

Local Companies

Butler Rowland Mays Architect Llp
(518) 885-1255
57 W High St
Ballston Spa, NY
Rovetto Design Group Incorporated
(518) 884-8450
51 Front St
Ballston Spa, NY
Syvertsen Architecture, PLLC
(212) 915-9376
Six Chelsea Place
Clifton Park, NY
Foresight Architects
(518) 372-3655
426 State St Ste 3,
Schenectady, NY
Thun Associates Architects, PC
(518)381-9050
230 Union St.
Schenectady, NY
Quality Landscape
(518) 842-9401
699 Mckay Rd
Amsterdam, NY
Farnum George T Architect
(518) 885-1705
78 Front St
Ballston Spa, NY
Taylor R J Builders Incorporated
(518) 885-6729
1422 Saratoga Rd
Ballston Spa, NY
Saratoga Design-Build
(212) 915-9427
8003 Wileytown Road
Middle Grove, NY
Re4orm Architecture
(518)399-4174
323 Clinton Street
Schenectady, NY
Data Provided by:
  

Provided By:

Edited By Rachel Z. Azoff

Meeting the accessible design and construction requirements of the Fair Housing Act can be easier said than done. Unfortunately, many developers don't realize they are in noncompliance until they receive a complaint or-even worse-news of a lawsuit.

"Understanding and implementing the requirements of the FHA, from design through construction, is critical to protect yourself," says Douglas J. Anderson, a partner with Chicago-based LCM Architects. "Accessibility is often measured in inches-and sometimes to a quarter of an inch. Careful attention to detail can mean the difference between FHA compliance and an FHA lawsuit."

Here, Anderson offers his list of 10 areas of common misconception when it comes to FHA design and construction.

1. State and Local Code Compliance

Many designers or owners assume that if they are in compliance with state and/or local codes, they automatically meet or exceed HUD's fair housing requirements. In general, most state or local codes do not meet or exceed HUD's interpretation of the FHA requirements in all areas, and the issuance of a permit or certificate of occupancy for state or local codes provides no assurance that the development meets the FHA requirements.

2. FHA Covered Units

For a typical site, the law applies to all ground-floor units in multifamily walk-up buildings with four or more units and all units in multifamily elevator buildings with four or more units.

Click here to read full article from Multi-Family Home

Related Articles
- Grout Pumps Amsterdam NY
The GHP 2000 pump handles grout or shotcrete, and is effective in grouting small ICF projects. The product is powered by a 20-hp gasoline engine and delivers 7 cu yd of grout/hr. It has a peristaltic pump, comes with built-in jack stands to stabilize the machine, and weighs 1000 lb.
- Framing Square Amsterdam NY
- Franchise Fundamentals Amsterdam NY
- Floating a Pergola in Place Amsterdam NY
- Hand-Held Power Saws Amsterdam NY
- Graphisoft EcoDesigner Amsterdam NY
- How Masonry Buildings Resist Earthquakes Amsterdam NY
- Green Construction Amsterdam NY
- High Cement Content Problems Amsterdam NY
- How to Choose a Grout Vibrator Amsterdam NY