Eliminating Swirls in Precast Panels East Elmhurst NY

What can we do to eliminate swirls in precast panels? Sid Freedman of the Precast/Prestressed Concrete Institute says such swirls are signs of segregation caused by the placing method. Read on to know more.

Local Companies

Fastenal- Mineola
516-294-7132
315-B Roslyn Road Mineola, NY, 11501
Mineola, NY
Auburndale Mason Supply
718-357-7889
40-02 Francis Lewis Blvd
Bayside, NY
The Home Depot
(516)997-9595
86 Jericho Turnpike
Jericho, NY
White Plains - A
(914) 644-1400
100 Main St
White Plains, NY
Rego Park - A
(718) 830-5900
9605 Queens Blvd
Rego Park, NY
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Cross Bay Hardware
(718) 848-5699
158-18 Cross Bay Blvd
Howard Beach, NY
The Home Depot
(718)333-9850
2970 Cropsey Avenue
Brooklyn, NY
The Home Depot
(718)818-9334
545 Targee Street
Staten Island, NY
Brooklyn/Beverley Rd - A
(718) 826-5800
2307 Beverley Rd
Brooklyn, NY
Data Provided by:
  

Source: THE CONCRETE PRODUCER/CONCRETE JOURNAL MAGAZINE
Publication date: December 1, 1998

We produce precast exposed-aggregate sandwich panels using concrete made with Type III cement, a 0.38 water-cementitious materials ratio and enough superplasticizer to achieve a 7- to 8-inch slump. The forming bed is made of wood. Using a bucket that passes down the center of the bed, we pour enough concrete for a 3-inch-thick layer and rake the concrete to the edges. We consolidate that layer with an immersion vibrator, then screed it off before adding a 2-inch-thick insulation board and 3 more inches of concrete.When we sandblast the formed panel surface to expose the 1/2-inch limestone, the limestone particles appear in groups or swirls. What can we do to eliminate this problem?

Sid Freedman of the Precast/Prestressed Concrete Institute says such swirls are signs of segregation caused by the placing method. You should place concrete on top of concrete in successive bucket passes because blending separate puddles or passes of concrete creates areas that are heavy in mortar. Raking can cause a similar problem.Ed Boyle, plant manager at Lombard Architectural Precast, Alsip, Ill., suggests using a placing bucket with a wider-than-normal gate, then overlapping each successive pass to eliminate paste streaks.He also suggests using a vibrating screed that hangs off of the form side rails at the correct depth to consolidate your first layer of concrete.

Click here to read full article from The Concrete Producer

Related Articles
- Eco-Friendly Products East Elmhurst NY
The advent of photovoltaic solar electric systems that connect and interact with grid power has opened up new categories of products to monitor, distribute, store, and control electrical supply and demand to and from solar-powered homes.
- Fan-Fold Foam Board East Elmhurst NY
- Flue Liners for Masonry Chimneys East Elmhurst NY
- Hand Tools East Elmhurst NY
- High-Efficiency Products East Elmhurst NY
- Home Exterior Products East Elmhurst NY
- Flashing at Sills East Elmhurst NY
- In Style with Tile East Elmhurst NY
- Eco-Friendly Product Reviews East Elmhurst NY
- Home Exterior Product Reviews East Elmhurst NY