Efficiency of Plant Operation Monroe NY

Plants can be old or new, transit mix or central mix, large or small in Monroe. But they all have one thing in common: How well they are managed has a significant effect on their overall efficiency. A simple definition of batch plant efficiency is the ratio of (a) the cost of inputs (employee hours, materials, energy, equipment, etc.) to (b) the revenue generated by sales of concrete. If you divide B by A and the result is less than one, you probably should begin planning your career change.

Local Companies

Mym Management Corp
(845) 782-8559
19 Fillmore Ct
Monroe, NY
Management Vision Inc
(212) 987-4300
177 E 87th St
New York, NY
C L K Management Corp
(718) 454-5001
9 Park Pl
Great Neck, NY
Savvion Inc
(212) 618-6362
1230 Avenue of Americas
New York, NY
Primary Control Systems Inc
(516) 349-1810
1 Fairchild Ct
Plainview, NY
R D Management
(845) 782-0720
215 Larkin Dr
Monroe, NY
Courtland Properties Inc
(845) 783-4493
581 State Route 17M
Monroe, NY
Appgen Business Software
(631) 273-0255
1300 Veterans Hwy
Hauppauge, NY
Dipu Multiple Business Inc
(718) 482-8186
4612 Queens Blvd
Long Island City, NY
Leveraged Networks
(516) 829-8300

Great Neck, NY

Source: CONCRETE PRODUCER MAGAZINE
Publication date: March 1, 2008

By Jay Robinson

Plants can be old or new, transit mix or central mix, large or small. But they all have one thing in common: How well they are managed has a significant effect on their overall efficiency.

A simple definition of batch plant efficiency is the ratio of (a) the cost of inputs (employee hours, materials, energy, equipment, etc.) to (b) the revenue generated by sales of concrete. If you divide B by A and the result is less than one, you probably should begin planning your career change.

The most efficient batch plants produce more concrete with less wasted material, lower repair costs, less downtime, and fewer disruptions in employee productivity. Initiatives such as more thorough quality control, understanding customer needs, and installing and operating concrete recycling systems will reduce waste.

Every operation is unique, yet the managers of highly efficient plants focus consistently on five key areas: preventive maintenance, cleanliness, batch control, driver staging, and safety.

1. Practice Preventive Maintenance (PM)

Plants where some kind of formalized inspection and maintenance schedule is in place tend to have fewer breakdowns. If the plant manager recognizes the importance of regular PM and communicates that to employees, chances are good that noisy bearings, worn belts, leaky air systems, and clogged filter bags will be detected and repaired before breakdowns interrupt batch...

Click here to read full article from The Concrete Producer

Related Articles
- Environmentally-Friendly Product Reviews Monroe NY
Recycled countertops are like the students in your high school class everyone envied: they are blessed with stunning good looks and amazing social skills, too. Recycled surfaces offer the benefits of being socially conscious without sacrificing style.
- High-Efficiency Products Monroe NY
- Green Products - Product Reviews Monroe NY
- High-Efficiency Toilets Monroe NY
- Forklift Operation Monroe NY
- Differences Between Green Globes and LEED Monroe NY
- How to Regreen a Home Monroe NY
- Ergonomic Principles of Forklift Design Monroe NY
- FAST Implementation Tips Monroe NY
- Forklift Maintenance Tips Monroe NY
Related Local Events
Postgraduate Assembly In Anesthesiology - Nyssa
Dates: 12/14/13 - 12/14/13
Location:
New York, NY
View Details

Chem Show
Dates: 12/10/13 - 12/12/13
Location: Jacob K. Javits Convention Center
New York, NY
View Details

International Council Of Shopping Centers/New York - Icsc
Dates: 12/3/13 - 12/3/13
Location:
New York, NY
View Details

The Gourmet Housewares Show
Dates: 8/18/13 - 8/18/13
Location:
New York, NY
View Details

NEW YORK ANTIQUE JEWELRY & WATCH SHOW 2013
Dates: 7/26/13 - 7/29/13
Location: Metropolitan Pavilion
New York, NY
View Details