Efficiency of Plant Operation Hamburg NY

Plants can be old or new, transit mix or central mix, large or small in Hamburg. But they all have one thing in common: How well they are managed has a significant effect on their overall efficiency. A simple definition of batch plant efficiency is the ratio of (a) the cost of inputs (employee hours, materials, energy, equipment, etc.) to (b) the revenue generated by sales of concrete. If you divide B by A and the result is less than one, you probably should begin planning your career change.

Local Companies

Business Solutions - The Positive Way
(716) 580-4564
64 Candlewood Ln., Ste. 100
Williamsville, NY
The Creative Problem Solving Group, Inc.
(716) 667-1324
6 Grand View Trail
Orchard Park, NY
Small Is Big Network
(716) 688-8675
34 Bywater Ct.
Williamsville, NY
Tzetzo Bros., Inc.
(716) 877-0800
1100 Military Rd.
Buffalo, NY
Generation Works
(716) 874-0999
129 Dorchester Rd.
Buffalo, NY
Excelleron Business Consulting, LLC
716 818-2526
33 Sawgrass
Hamburg, NY
Ciredon Group LLC
(716) 946-7562
PO Box 945
Orchard Park, NY
Darwin Associates
(716) 446-0873
559 Crescent Ave.
Buffalo, NY
Culinary Arts Specialties, Inc.
(716) 656-8943
2268 Union Rd.
Cheektowaga, NY
General Mills, Inc.
(716) 856-6060
54 South Michigan Ave.
Buffalo, NY

Source: CONCRETE PRODUCER MAGAZINE
Publication date: March 1, 2008

By Jay Robinson

Plants can be old or new, transit mix or central mix, large or small. But they all have one thing in common: How well they are managed has a significant effect on their overall efficiency.

A simple definition of batch plant efficiency is the ratio of (a) the cost of inputs (employee hours, materials, energy, equipment, etc.) to (b) the revenue generated by sales of concrete. If you divide B by A and the result is less than one, you probably should begin planning your career change.

The most efficient batch plants produce more concrete with less wasted material, lower repair costs, less downtime, and fewer disruptions in employee productivity. Initiatives such as more thorough quality control, understanding customer needs, and installing and operating concrete recycling systems will reduce waste.

Every operation is unique, yet the managers of highly efficient plants focus consistently on five key areas: preventive maintenance, cleanliness, batch control, driver staging, and safety.

1. Practice Preventive Maintenance (PM)

Plants where some kind of formalized inspection and maintenance schedule is in place tend to have fewer breakdowns. If the plant manager recognizes the importance of regular PM and communicates that to employees, chances are good that noisy bearings, worn belts, leaky air systems, and clogged filter bags will be detected and repaired before breakdowns interrupt batch...

Click here to read full article from The Concrete Producer

Related Articles
- Differences Between Green Globes and LEED Hamburg NY
Both standards cover similar grounds, such as site sustainability, energy efficiency, water efficiency, resource efficiency, and indoor environmental quality. They have four possible levels of certification, require third-party certification, and have a minimum amount of points that builders must attain in each section. Different builders may adopt either of these standards.
- High-Efficiency Products Hamburg NY
- Ergonomic Principles of Forklift Design Hamburg NY
- How to Regreen a Home Hamburg NY
- Environmentally-Friendly Product Reviews Hamburg NY
- FAST Implementation Tips Hamburg NY
- High-Efficiency Toilets Hamburg NY
- Forklift Maintenance Tips Hamburg NY
- Green Products - Product Reviews Hamburg NY
- Forklift Operation Hamburg NY
Related Local Events
Western New York ''Mega'' RV and Boat Show
Dates: 4/12/13 - 4/14/13
Location: Fairgrounds Event Center
Hamburg, NY
View Details

Networking with a Twist
Dates: 4/23/09 - 4/23/09
Location: LaserTron
Amherst, NY
View Details