Drainage System Testing Valley Stream NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in Valley Stream. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

B & B Construction
(212) 661-6008
420 Lexington Ave
New York, NY
ContiGroup
(212) 207-5100
277 Park Avenue
New York, NY
BELLA PORTA LLC.
888-366-7748
92 Front street
Hempstead, NY
Alliance Construction Gro
(201) 435-0854
293 Martin Luther King Jr DR
Jersey City, NJ
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
Atria Builder
(212) 876-2756
330 E 109th St
New York, NY
Cross Coungy Woodworking
914-447-4671
20 Gunther Ave
Yonkers, NY
Home Helper Agency
(212) 768-9759
165 W. 46th Street
New York, NY
Andrew's Interior Restoration
(201) 660-4268
1708 Kerrigan Ave
union city, NJ
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Data Provided by:
  

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html

Related Articles
- Creating Herb Gardens Valley Stream NY
Herbs have been around since time immemorial and served different kinds of purposes. They have been used to treat illness and flavour cooking; they were even believed to have magical powers. Do you want to have your own herb garden? Here are a few ideas on how to establish an herb garden.
- Growing Tomatoes Valley Stream NY
- Fixtures and Products for the Bath Valley Stream NY
- Central Heating System Valley Stream NY
- Preventing Basement Floods Valley Stream NY
- How to Diagnose and Clear Cloudy Swimming Pool Water Valley Stream NY
- Regular Roof Maintenance and Inspections Valley Stream NY
- How to Design and Install a Radiant Floor Heating System Valley Stream NY
- Gutters Valley Stream NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details