Drainage System Testing Rockaway Park NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in Rockaway Park. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

MSA QUALITY,INC
(347) 499-1141
2800 COYLE
brooklyn, NY
Great Neck Saw Manufacturers
(516) 746-5352
165 East Second Street
Mineola, NY
Omnibuild, LLC
(212) 419-1930
29 Broadway
New York, NY
UNITED CRANE RIGGING DEMOLITION
718-726-6111 973-384-5904
11-14 35TH AVENUE
LIC, NY
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
Arcon Construction Services
(212) 752-3261
411 E 57th St
New York, NY
Transammonia Inc.
(212) 223-3200
320 Park Avenue
New York, NY
Bayada Nurses
(212) 354-9400
252 West 38th Street
New York, NY
Automated Shading
212 929 9206
917 74th St
North Bergen, NJ
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Data Provided by:
  

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html

Related Articles
- Growing Tomatoes Rockaway Park NY
Container gardens, are the perfect starter gardens, as you have more control, and the garden will not get away from you, the way a large one can. I am sure it has happened to all of us at one time or another, it certainly happened to me. Vegetable gardens, especially tomato gardens are a lot of work, but rewarding.
- Fixtures and Products for the Bath Rockaway Park NY
- Creating Herb Gardens Rockaway Park NY
- Preventing Basement Floods Rockaway Park NY
- Gutters Rockaway Park NY
- How to Design and Install a Radiant Floor Heating System Rockaway Park NY
- How to Diagnose and Clear Cloudy Swimming Pool Water Rockaway Park NY
- Regular Roof Maintenance and Inspections Rockaway Park NY
- Central Heating System Rockaway Park NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details