Drainage System Testing Ridgewood NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in Ridgewood. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

american weatherproofing system
973 9306105
629 river st
paterson, NJ
Hanforged Iron Works
646-302-9335
5600 Grand Avenue
Maspeth, NY
Best Rate Construction Inc
(201) 413-9110
305 Grove St
Jersey City, NJ
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Van Go General Contracting
(201) 387-9013
326 So. Washington Ave
Bergenfield, NJ
A PERFECT PAINTER AND WALLPAPER
(212) 262-1959
459,w 47st
new york, NY
KNK Construction Inc
212 398-1014
155 Avenue of the Americas 3rd Fl
New York, NY
CWC Plumbing and Heating LLC
718-268-8898
90-04A 70th Avenue
Forest Hills, NY
Home Construction World Inc
(201) 369-0333
76 Van Wagenen Ave
Jersey City, NJ
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
Data Provided by:
  

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html

Related Articles
- Central Heating System Ridgewood NY
Central heating is very different from local heating in the way heat is generated. In central heating, heat generation occurs in one place, such as a furnace room in a house or a mechanical room in a large building through the combustion of fossil fuel in a furnace or boiler.
- How to Diagnose and Clear Cloudy Swimming Pool Water Ridgewood NY
- Fixtures and Products for the Bath Ridgewood NY
- How to Design and Install a Radiant Floor Heating System Ridgewood NY
- Gutters Ridgewood NY
- Creating Herb Gardens Ridgewood NY
- Regular Roof Maintenance and Inspections Ridgewood NY
- Growing Tomatoes Ridgewood NY
- Preventing Basement Floods Ridgewood NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details