Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in Poughkeepsie. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

Pioneer Blacktopping
(123) 456-7890
10 North Street
Wappingers Falls, NY
Alfandre Architecture, PC
(845) 255-4774
7 Innis Avenue
New Paltz, NY
Trapps Builders Inc.
(845) 895-1782
199 Denniston Rd.
Wallkill, NY
Ash-N-Oak Home Improvements
(845) 750-5330
19 Hummel Road
New Paltz, NY
Robert Waltke & Son, LLC
(845) 895-2238
46 Sycamore Drive
Wallkill, NY
NORTH EASTERN CONTRACTING
914-490-4100
1127 rt.9
wappinger falls, NY
MV custom inc
845 2262375
803 beekman road
hopewell jct, NY
Cooper & Company
(914) 456-9900
PO Box 344
West Park, NY
New Paltz Roll Offs, Inc.
(845) 255-4745
PO Box 179
Tillson, NY
Jim Whitney Home Improvements
(845) 255-2773
75 Dug Rd.
New Paltz, NY

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html

Related Articles
- Central Heating System Poughkeepsie NY
Central heating is very different from local heating in the way heat is generated. In central heating, heat generation occurs in one place, such as a furnace room in a house or a mechanical room in a large building through the combustion of fossil fuel in a furnace or boiler.
- Gutters Poughkeepsie NY
- How to Design and Install a Radiant Floor Heating System Poughkeepsie NY
- Creating Herb Gardens Poughkeepsie NY
- How to Diagnose and Clear Cloudy Swimming Pool Water Poughkeepsie NY
- Growing Tomatoes Poughkeepsie NY
- Regular Roof Maintenance and Inspections Poughkeepsie NY
- Fixtures and Products for the Bath Poughkeepsie NY
- Preventing Basement Floods Poughkeepsie NY