Drainage System Testing North Tonawanda NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in North Tonawanda. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

Birdair, Inc.
(716) 633-9500
65 Lawrence Bell Dr., Ste. 100
Williamsville, NY
Robert Miller Construction, Inc.
(716) 434-8807
PO Box 480
Lockport, NY
Landmasters Group, Inc.
(716) 771-1304
3021 Transit Rd.
Elma, NY
Warehouse Wholesaler.com
(716) 947-5552
3774 Lake Shore Rd.
Buffalo, NY
Empire Machine Tool Services
(716) 208-0040
PO Box 2481
Blasdell, NY
Rayford Enterprises, Inc.
(716) 854-3331
281 Exchange St.
Buffalo, NY
Lamparelli Construction Co., Inc.
(716) 891-8599
590 Kennedy Rd.
Cheektowaga, NY
Lang's Landscaping, Inc.
(716) 633-1983
25 Smallwood Terr.
Cheektowaga, NY
D.J. Martin Equipment Inc.
(716) 633-5808
8350 Main St.
Williamsville, NY
Industrial Support, Inc.
(716) 827-1825
36 Depot St.
Buffalo, NY

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html

Related Articles
- Central Heating System North Tonawanda NY
Central heating is very different from local heating in the way heat is generated. In central heating, heat generation occurs in one place, such as a furnace room in a house or a mechanical room in a large building through the combustion of fossil fuel in a furnace or boiler.
- Growing Tomatoes North Tonawanda NY
- Gutters North Tonawanda NY
- How to Diagnose and Clear Cloudy Swimming Pool Water North Tonawanda NY
- Fixtures and Products for the Bath North Tonawanda NY
- How to Design and Install a Radiant Floor Heating System North Tonawanda NY
- Regular Roof Maintenance and Inspections North Tonawanda NY
- Preventing Basement Floods North Tonawanda NY
- Creating Herb Gardens North Tonawanda NY