Drainage System Testing Melville NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in Melville. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

junk junkies, junk removal, nyc-stay clutter free, live green!
888-433-4133
229-19 merrick blvd suite345
jamaica, NY
Fox Hill Builders, Inc.
(203) 655-9046
1921 Post Road
Darien, CT
Saugatuck Construction Group
(203) 323-6500
54 Research Drive
Stamford, CT
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Building Structures Unlimited
888-492-1136
17 Reservoir Road Suite 3A
Melville, NY
Great Neck Saw Manufacturers
(516) 746-5352
165 East Second Street
Mineola, NY
trinchese iron works and construction inc.
(718) 848-1954
3375 royal ave
oceanside, NY
Stephen C. Gidley, Inc.
(203) 655-7018
693 Post Road
Darien, CT
AM Shield Waterpoofing
516 294-8400
33 Albertson Ave.
Albertson, NY
Total Home Construction Corp (since 1989)
(516) 822-4747
1120 Old Country Rd
Plainview, NY
Data Provided by:
  

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html

Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details