Drainage System Testing Manlius NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in Manlius. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

Ryan Heneka's Decorative Concrete
315.506.0336
105 Melvin Avenue
Liverpool, NY
Canastota Concrete Company
(315) 363-4240
East Walnut Street
Oneida, NY
MEID Construction
(315) 361-1768
1341 Middle Rd
Oneida, NY
Block and Rocks
(315) 363-3814
1060 Cobb St
Oneida, NY
Hess Corporation
(315) 234-5330
100 Clinton Sq.
Syracuse, NY
Distinctive Innovations, Inc.
315-696-6672
9 Clinton St.
Tully, NY
New Heritage Woodworking
315-677-3884
7022 Bush Road
Jamesville, NY
Lamb's Construction Inc
(315) 363-5537
146 E. Campbell Ave
Sherrill, NY
Boylan Marble & Terrazzo Restoration
315-363-3365
1816 W. Elm Street
Oneida, NY
Snyder Engineering & Land Survey
(315) 361-4639
214 Cedar St.
Oneida, NY

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html