Drainage System Testing Hopewell Junction NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in Hopewell Junction. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

Advanced Construction Enterprises
203-947-6318
21 Meadowland Drive
Gaylordsville, CT
A. Prokosch & Sons/Pro-Air Heating & Air Conditioning
845-913-7191
772 South Street
Newburgh, NY
Winter Sun Construction Inc.
(845) 256-1031
43 North Chestnut Street
New Paltz, NY
Erdman Anthony & Associates, Inc.
(845) 883-5078
60 Park Lane, Suite 1
Highland, NY
Wish You Wood,Inc.
845-787-3600
19 hudson terrace
Marlboro, NY
NORTH EASTERN CONTRACTING
914-490-4100
1127 rt.9
wappinger falls, NY
Cafarelli Carpentry, Tile and Handyman Contracting
845-453-1690
33 Townview Dr
Wappingers falls, NY
Cooper & Company
(914) 456-9900
PO Box 344
West Park, NY
Ash-N-Oak Home Improvements
(845) 750-5330
19 Hummel Road
New Paltz, NY
KEM Landscaping LLC
(845) 236-7878
PO Box 265
Clintondale, NY

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html